Established 2011  ·  OR 97214
Craftsman Home Interiors
About

The story behind us

Built with care. Finished to last.

Daniel Mercer
Founder

Daniel Mercer started Craftsman Home Interiors in 2011 after twelve years working as a finish carpenter and project supervisor for a mid-size general contractor in Portland. He had spent those years watching renovation projects go sideways not because of bad tradespeople, but because of poor coordination, vague scoping, and homeowners who were never told what was actually happening on their own job. He started the company with one truck, a small crew of three, and a straightforward idea: treat the homeowner's house the way you would treat your own.

The company grew steadily through referrals. By 2016, Craftsman Home Interiors had added a dedicated bathroom and tile crew and brought flooring installation in-house. The turning point came in the winter of 2018, when a client in Sellwood hired the team to restore a 1924 Craftsman bungalow that had been through three decades of mismatched renovations. That project took seven months and required matching original fir trim, rebuilding a damaged plaster ceiling, and sourcing period-appropriate hardware from a salvage yard in Northeast Portland. It was the kind of job that clarified what the company was actually good at: careful, detail-oriented work in homes that deserve to be treated with respect.

Today the team includes eight full-time tradespeople and two project leads, and the company serves homeowners across Portland, Lake Oswego, Beaverton, Tigard, and Gresham. Daniel still does the initial site visit on every project. The work has not changed much since 2011: show up on time, do what you said you would do, and leave the house better than you found it.

How we restore

Daniel Mercer does the first site visit on eve Original fir floors sanded and refinished, period double-hung sash windows rebuilt in the shop and rehung with new weatherstripping
Written estimates break down every line item b Handmade ceramic tile reinstalled in bathroom, original built-in buffet restored with period-matched hardware sourced from a salvage yard in Northeast Portland
Moisture and subfloor assessment completed bef Reproduction crown mouldings milled to match original profiles, plaster ceiling repaired with three-coat lime plaster over new lath
Low-VOC paints used on all interior painting p Original inglenook rebuilt with salvaged brick, period-accurate picture rail and plate rail reinstalled throughout the main floor
30-day post-completion check-in scheduled for Exposed fir joists cleaned and sealed after dropped ceiling removed, shaker cabinetry fitted to match original built-ins
Period-detail matching available for pre-1950 Knotty pine paneling in the study restored and refinished, original casement windows reglazed and fitted with new hardware

Ready to talk about your project?

We respond to every inquiry within one business day. The initial site visit and written estimate are always free.

Contact us
Secure checkoutReviewed by clientsHand-finished